| Retention money | ₹50,000 (6 months from Graha Pravesam, RCC works) | ₹50,000 (6 months from Graha Pravesam, RCC works) | ₹50,000 (6 months from Graha Pravesam, RCC works) |
| Maintenance period | 6 months after pooja | 9 months after pooja | 9 months after pooja |
| Structural warranty | 15 years | 15 years | 15 years |
| Quality checklist | 378-point checklist | 378-point checklist | 378-point checklist |
| 2D floor plan | Yes | Yes | Yes |
| 3D elevation | No | Yes | Yes |
| 3D walkthrough video | No | No | Yes |
| Electrical & plumbing drawings | Basic electrical for roof | Advanced | Advanced |
| Good for construction drawing (GFC) | Yes | Yes | Yes |
| Soil test | Client scope | VRA scope | VRA scope |
| Structural drawing | Yes | Yes | Yes |
| Total station digital marking | 1-time footing & column | 1-time footing & column | All-floor column marking |
| Site survey | Included | Included | Included |
| Construction app (monitoring & tracking) | Yes | Yes | Yes |
| Water test | Client scope | Client scope | VRA scope |
| Updates | WhatsApp | WhatsApp | WhatsApp |
| Brand & grade follow | 100% | 100% | 100% |
| Construction management | Dedicated site engineer | Dedicated site engineer | Dedicated site engineer |
| Owner participation | Selection of finishing materials | Selection of finishing materials | VRA suggestions to the doorstep |
| Column & roof beam | Followed by structural design | Followed by structural design | Followed by structural design |
| Cement | Ultratech, Ramco & Dalmia (as available) | Ultratech & Dalmia (as available) | Ultratech & Dalmia (as available) |
| TMT steel 550D | ARS CRS | SAIL or equivalent | JSW & Tata |
| M-sand | Double-washed M-sand | Double-washed M-sand | Double-washed M-sand |
| Concreting | Vibrator applied | Vibrator applied | Vibrator applied |
| Brickwork | Wire-cut bricks | Wire-cut bricks | Wire-cut bricks |
| Footing depth | 6.5 to 7 ft (as per structural design) | 6.5 to 7 ft (as per structural design) | 6.5 to 7 ft (as per structural design) |
| Concrete ratio | M20 / M25 (RMC & machine mix) | M20 / M25 (RMC & machine mix) | M20 / M25 (RMC & machine mix) |
| Footing protection | Extra cover gap for steel protection | Extra cover gap for steel protection | Extra cover gap for steel protection |
| Footing pedestal depth | 1 to 2 ft (as per structural design) | 1 to 2 ft (as per structural design) | 1 to 2 ft (as per structural design) |
| Size of column | 1'3" to 2'0" | 1'3" to 2'0" | 1'3" to 2'0" |
| Bars in columns & beams | 12 mm, 16 mm, 20 mm (as per structural design) | 12 mm, 16 mm, 20 mm (as per structural design) | 12 mm, 16 mm, 20 mm (as per structural design) |
| Waterproofing (below structure) | Bitufix applied | Bitufix applied | Bitufix applied |
| Plinth beam | M20 / M25 (RMC & machine mix), protected by PCC at bottom | M20 / M25 (RMC & machine mix), protected by PCC at bottom | M20 / M25 (RMC & machine mix), protected by PCC at bottom |
| Tie beam | Provided above 3 ft | Provided above 3 ft | Provided above 3 ft |
| Brickwork at basement | Fly-ash brick (high compressive strength) | Fly-ash brick (high compressive strength) | Fly-ash brick (high compressive strength) |
| Basement wall protection | Bitufix coating inside basement | Bitufix coating inside basement | Two-side plastered |
| PCC on basement | PCC | PCC | PCC |
| Compound (if in additional scope) | Linked with plinth beam | Linked with plinth beam | Linked with plinth beam |
| Wall thickness | 9" & 4.5" | 9" & 4.5" | 9" & 4.5" |
| Roof concreting grade | M20 / M25 (as per structural design) | M20 / M25 (as per structural design) | M20 / M25 (as per structural design) |
| Sill and lintel | Throughout walls | Throughout walls | Throughout walls |
| 4-inch brick partition steel mesh | 4 rows once | 4 rows once | 3 rows once |
| Loft & cupboard | Free of cost (cupboard in Kadapa stone, T&C) | Free of cost (cupboard in Kadapa stone, T&C) | Free of cost (cupboard in Kadapa stone, T&C) |
| Ceiling height | 10 ft | 10 ft | 11 ft |
| Slab thickness | 5" | 5" | 5" |
| Sunken slab | Provided | Provided | Provided |
| Curing | Twice on all working days | Twice on all working days | Twice on all working days |
| Roof concrete deshuttering | 15 days | 15 days | 15 days |
| Brickwork curing | 7 days | 7 days | 7 days |
| Flooring tile (2x2 or 4x2) | ₹60 / sqft | ₹60 / sqft | Granite flooring, ₹85 / sqft base |
| Toilet tile | ₹45 / sqft | ₹45 / sqft | ₹50 / sqft |
| Kitchen wall tile | ₹45 / sqft | ₹45 / sqft | ₹50 / sqft |
| Parking floor tile | ₹45 / sqft | ₹45 / sqft | ₹50 / sqft |
| Sit-out / elevation | ₹45 / sqft | ₹45 / sqft | ₹50 / sqft |
| Main door entrance step | Tile ₹60 / sqft | Granite ₹120 / sqft | Granite ₹120 / sqft |
| Inner staircase step | Full-body vitrified tile ₹100 / sqft | Full-body vitrified tile ₹120 / sqft | Granite ₹120 / sqft |
| Kitchen counter | Granite ₹120 / sqft | Granite ₹120 / sqft | Granite ₹250 / sqft |
| Kitchen shelf | Kadapa | Kadapa | Kadapa |
| Floor spacers | Toilet floor, wall tiles and cool-roof tiles | Toilet floor, wall tiles and cool-roof tiles | Toilet floor, wall tiles and cool-roof tiles |
| Main door (3'6" × 7'0") | 1.5" teak door & frame ₹35,000 | 1.5" teak door & frame ₹50,000 | 1.5" teak door & frame ₹50,000 |
| Main door fittings | SS & brass mixed | Full brass | Full brass |
| Bedroom door (3' × 7') | Frame, door and fittings ₹7,500 | Frame, door and fittings ₹8,000 | Frame, door and fittings ₹9,000 |
| Toilet door (2'6" × 7') | WPC frame and door ₹5,000 | WPC frame and door ₹5,000 | WPC frame and door ₹6,000 |
| Backyard door | WPC frame and door ₹5,000 | WPC frame and door ₹5,000 | GI steel door ₹12,000 |
| Windows with grill | UPVC ₹550 / sqft | UPVC ₹550 / sqft | UPVC colour ₹750 / sqft |
| Windows | 3' × 4', 2 per area | 4' × 4', 2 per area | 5' × 4', 2 per area |
| Window grill | 8 mm and 10 mm rod | 12 mm rod | 12 mm rod |
| Window glass | 5 mm pinhead glass | 5 mm pinhead glass | 5 mm pinhead glass |
| External plumbing | UPVC / PVC | UPVC / PVC | UPVC / PVC |
| Internal hot water line | CPVC | CPVC | CPVC |
| Water supply to toilet & kitchen | Metro water & bore water | Metro water & bore water | Metro water, solar water & bore water |
| Dining washbasin | Yes | Yes | Yes |
| Car wash tap (one point) | Yes | Yes | Yes |
| Water pressure test | Provided | Provided | Provided |
| Pressure pump | Socket at water tank | Socket at water tank | Socket at water tank |
| Plumbing pipe fixing | Apartment clamp | Apartment clamp | Apartment clamp |
| Sanitary ware | ₹15,000 per toilet + 1 dining washbasin | ₹20,000 per toilet + 1 dining washbasin | ₹25,000 per toilet + 1 dining washbasin |
| OHT tank | Triple-layer white 1,000 L × 2 | Triple-layer white 1,000 L × 2 | Triple-layer white 1,000 L × 2 |
| Gas cylinder outside kitchen | Additional scope | Additional scope | Provided free of cost |
| Electrical wire | Orbit FRLS | Finolex FRLS | Finolex FRLS |
| Conduits for DTH / TV & Wi-Fi | Provided | Provided | Provided |
| Chemical earthing | Additional scope | Additional scope | 2 nos free of cost |
| Switch box | 2 per room | 4 per room | 4 per room |
| AC provision | In all bedrooms | In all bedrooms | In all bedrooms |
| EV point | Yes | Yes | Yes |
| Dishwasher | If required | If required | If required |
| Solar provision | One empty conduit | One empty conduit | One empty conduit |
| Switch (white) | GM / Legrand / Anchor (basic) | GM / Legrand / Anchor (basic) | GM / Legrand / Anchor (basic) |
| 3-phase wiring | Yes (RCCB extra) | Yes (RCCB extra) | Yes (RCCB extra) |
| MCB panel | Orbit with rotary switch | Legrand / Fybros with rotary switch | Legrand / Fybros with rotary switch |
| Lighting provision (spot lights) | All-area provision (décor lights & wires: client scope) | All-area provision (décor lights & wires: client scope) | All-area provision; spotlight purchase free (wire: client scope) |
| UPS wiring (one point) | Provided | Provided | Provided |
| CCTV piping | Extra (camera & wiring additional) | 2 CCTV provisions (camera & wiring additional) | 4 CCTV provisions (camera & wiring additional) |
| Home automation | No | No | Water-tank automation free of cost |
| Staircase structure | RCC staircase, 1-fold design | RCC staircase, 1-fold design | RCC staircase, 1-fold design |
| Inner handrail | SS handrail ₹800 / rft | SS handrail ₹800 / rft | SS handrail ₹1,000 / rft |
| Outer handrail | SS handrail ₹800 / rft | SS handrail ₹800 / rft | SS glass handrail ₹1,200 / rft |
| Parapet wall | 3.5 ft, 4.5" thick (9" wall extra ₹220 / sqft) | 3.5 ft, 4.5" thick (9" wall extra ₹220 / sqft) | 3.5 ft, 4.5" thick (9" wall extra ₹220 / sqft) |
| Additional parapet height | ₹145 / rft extra | ₹145 / rft extra | ₹145 / rft extra |
| Toilet niche | Yes, tile ₹50 / sqft | Yes, tile ₹50 / sqft | Yes, tile ₹50 / sqft |
| Toilet waterproofing | Dr. Fixit | Dr. Fixit | Dr. Fixit |
| Plastering | Cement plastering | Cement plastering | Cement plastering |
| External painting | 2 coats Birla White on 3 sides; putty finish on front | 2 coats Birla White on 3 sides; putty finish on front | 2 coats Birla White on 3 sides; putty finish on front |
| Internal painting | Putty finish with 2 coats Tractor emulsion | Putty finish with 2 coats premium Tractor emulsion | Putty finish with 2 coats Royale emulsion |
| External portico putty | 2 coats Tractor emulsion | Putty finish with 2 coats Apex emulsion | Putty finish with 2 coats Apex Ultima |
| To avoid cracks | RCC & brickwork joint fibre mesh | RCC & brickwork joint fibre mesh | RCC & brickwork joint fibre mesh |
| Setback area | Cement flooring | Cement flooring | Tile finish or cobble stone ₹50 / sqft |
| Weathering course | 2 coats Dr. Fixit + 3" cement coarse + cool-roof tile | 2 coats Dr. Fixit + 3" cement coarse + cool-roof tile | 2 coats Dr. Fixit + 3" cement coarse + cool-roof tile |
| Worker shed & toilet facility | Provided by client | Provided by client | VRA scope |
| Compound wall | Add-on | Add-on | Add-on |
| Terrace white tiles | Cement screed in VRA scope | Cement screed in VRA scope | Cement screed in VRA scope |
| Sump, septic & overhead tank | Sintex tank, VRA scope (2 nos) | Sintex tank, VRA scope (2 nos) | Sintex tank, VRA scope (2 nos) |
| Balcony / French door & designer grills | Add-on | Add-on | Add-on |
| MS or SS gate | Add-on | Add-on | Add-on |
| Soil filling (inside & outside) | ₹30,000 (VRA scope; govt-approved bill shown) | ₹40,000 (VRA scope; govt-approved bill shown) | ₹65,000 (VRA scope; govt-approved bill shown) |
| Extra basement / ceiling height | Add-on | Add-on | Add-on |
| Borewell | Add-on | Add-on | Add-on |
| EB work | Add-on | Add-on | VRA scope |
| Exterior designer tiles & finishes | Add-on | Add-on | Add-on |
| Pile foundation | Add-on | Add-on | Add-on |
| Interior works | Add-on | Add-on | Add-on |
| Lift-related works | Add-on | Add-on | Add-on |